Signal Box Door Built of site

 

 


 



Signal Box Windows Built of site

     
 

 

Construction of the main Building Started in March

     
 

 

April the 3rd Signal Box erected on location at Rudyard

     
 

 

April 3rd Signal box Stand on location
at Rudyard

     
 

 

 

Signal Box get first coat of
Red & Cream

     
 


All the Level crossing and Signalling equipment moved in to the signal box from the old track side box

     
 


 

 

Levers installed to work the Signals,
Level Crossing & Point/s

     
 

 

Signal indicators & Train detection dials installed and operational

     
 

 

 

 

New Token machine installed just before the steam gala  June 2004

     
 

 

Excalibur departs from Rudyard station and passes the Signal Box

     